Club La Santa will undertake improvements and renovations to the resort from time to time throughout the year.
Noise will be kept to a minimum and generally operates during working hours 8am till 4pm.
Upcoming renovation work at Club La Santa:
Pool Bar (1st November 2025 – June 2026)
A new and improved Pool Bar is on the way! From 1st November 2025 to June 2026, a significant renovation of the Pool Bar will take place. The aim is to modernize the area and create the best conditions for the Pool Bar to remain a pleasant and relaxing meeting place in the future.
During this period, the Pool Bar will be closed, and construction noise may be noticeable in the surrounding area, with working hours from 8 to 18 on weekdays.
Roof Structure at the Square / La Plaza (5th May – June 2025)
From 5th May to late June 2025, the Roof Structure at The Square / La Plaza will be replaced. All shops will remain open as usual and Restaurant La Plaza and Sports Café will continue to welcome guests in the evenings. The work may cause some noise during the day, with working hours from 8:00AM to 4:00PM on weekdays.
Administration Building at the Stadium (Date TBC)
We are planning to build a new administration building at the entrance of the stadium. The new building will be home to the Supermarket, Sports Booking, the Reservations Department, the Groups and Conferences Department, Administration, IT, Marketing, and the Events and Sports Department.
The Pitch (May 2025)
Club La Santa, upgrading pitch May – June 2025 – Starting 05th May 2025 and finishing approx. 27th June 2025, we will be upgrading our football pitch by replacing the current natural grass with state-of-the-art artificial turf. The artificial turf is environmentally friendly and produced under strict EU regulations. This aligns with Club La Santa’s sustainability goals by eliminating the need for water, fertilizers, and intensive maintenance. Unlike natural grass, which often required partial closures for upkeep, the new turf will create a large, consistently usable space for activities.
During the period of renovation, a few areas will be affected:
- The football pitch will be unavailable. Football activities will be offered on our five-a-side court.
- There will be some noise from construction equipment and trucks coming in and out of the site.
- For safety reasons, the athletic track will be partly closed from 7:30 AM to 4:00 PM each day. Outside of these hours, the 3 outer lanes on the track will remain open for use.
After the renovation, only javelins with rubber tips will be permitted at Club La Santa.
Completed renovation work at Club La Santa:
Trackman Studio (June 2024)
You can now experience golf like never before in our TrackMan Studio. The ultimate indoor golf simulator for swing and ball flight tracking, high-level 1-to-1 tuition and some of the best courses in the world.
Hyrox (May 2024)
Club La Santa now hosts the world’s first fully equipped outdoor HYROX Gym, located in the Functional Zone at the stadium. It is the ultimate fitness race for everyone, combining running and functional workouts. Come experience the next level of fitness at our state-of-the-art facility!
Single Padel Court (Febuaury 2024)
Now you have even more opportunities to practice padel during your holiday. We have opened 4 new single padel courts that are half the size of a traditional Padel court. They are made with Hydro Restore Aluminium and its texturized fibre provides a superior grip and a consistent bounce.
3×3 Basketball Court (December 2023)
We have transformed our basketball court into a 3×3 court with an improved playing surface. The half-court setup makes it a fast-paced and dynamic game. A perfect spot if you’re a seasoned player or you just want to have some fun in the sun.
Playground in front of play time (November 2023)
We have created a new fantastic Playground for small kids in front of Play Time. The playground offers kids a perfect opportunity to move around, crawl through tunnels, play on trampolines and much more.
Pickleball (October 2023)
Our newest addition to the racket sports is pickleball, a low impact, easy-to-learn sport which combines elements from tennis, badminton, and table tennis. It is played on a smaller court with paddles and works both as a singles and doubles game. You can play pickleball on one of our four pickleball courts on the multicourt (Tennis court 8) or on our indoor badminton courts with a 0.9m lowered net.
Wellness Centre (November 2022)
To offer you the most welcoming experience, the entrance of the Wellness Centre has been improved and is now more organic and exclusive. Also, the outdoor terrace has been upgraded with an exceptional spa and chillout area.
South Pools (February 2022)
Due to issues in the original construction, we have renovated our two South Pools.
Sports Café (November 2021)
The Sports Café has been given a complete makeover and now welcomes our guests with a fresh and modern look.
Restaurant Atlántico (April 2021)
The buffet restaurant Atlántico has been 100% refurbished and improved. You can now look forward to visiting a whole new, bright and spacious restaurant with a modern and welcoming design.
La Rambla (October 2020)
We have designed a new garden landscape between the Stadium and apartments.
New Tennis Centre Court (October 2020)
We have finalized the renovation of our new tennis centre court. Three of our tennis courts have been converted into a new, unique centre court with spectator seats on both sides. The court has been built lower in the ground for protection from the wind. This means that we will have 8 exclusive tennis courts available with Decoturf base, the official surface of the US Open. We have also built solid walls on all other courts to better protect them from the wind.
New Outdoor CrossFit Area (October 2020)
The CrossFit area has moved to behind tennis court 8 in the area just before entering the Volcano. It has doubled in size and a storeroom and special floor have been installed. The new area gives space for social distancing during classes and daily use.
New Athletics Track (September 2020)
We are proud to announce that we have finished the renovation of our new athletics track. The new surface is called Conica CONIPUR Vmax, a highly technical, very sophisticated running surface. The track has been divided into training and leisure lanes. This means athletic groups and serious individual athletes won´t be disturbed by other runners, as they have a wide outer lane with a dedicated surface for leisure running. Our new track will also be equipped with Polytan SmarTracks, making it possible to track your motion in relation to the running track by wearing a sensor. This will be incorporated into the two outer 110m sprint lanes, the inside lane of the full track, and the 45m runway for triple- and long jump. The data will be available in real-time on computers or smartphones connected to the internet. Multiple groups can use the technology at the same time. Individual guests are also able to use this feature.
Extra Padel Tennis Court (August 2020)
We have finalized the building of an additional padel tennis court, which means that we now have a total of 6 courts.
Renewed Tennis Court 8 with SMASH-BACK wall (July 2020)
Exclusive tennis court number 8 (previously court 10), has undergone a complete refurbishment and it is now surrounded by solid walls on three sides for better wind protection. The court is equipped with a 14-metre unique SMASH-BACK tennis wall as well as line indications for training on the opposite straight concrete wall. The unique curve geometry means you can train almost as if you were training with a real opponent.
The shape of this practice wall was created in collaboration with tennis professionals and the ball bounces realistically, similar to the return from an opponent.
New Inner Coating for the Leisure Pool (July 2020)
The Leisure Pool has received a new inner coating.
Club La Santa merchandise shop (July 2020)
The Club La Santa merchandise shop has been completely refurbished with a clean, modern look.
Restaurants (July 2020)
In our exclusive Restaurant El Lago, a new floor has been laid to upgrade the interior design. The flooring in our buffet restaurant, Atlantico, has also been partially replaced. All restaurants have been prepared for new COVID-19 measures.
Accommodations (July 2020)
All apartments and suites have been painted and all smaller repairs have been completed.
Sports Booking (July 2020)
Sports Booking has moved to its original position in tower 28, next to Restaurant Atlantico and facing the leisure pool. The old Sports Booking building at the stadium has been removed.
The Lawn (July 2020)
The Lawn is equipped with new artificial grass that has more sand, making it more suitable for twists and turns while dancing.
Avenida Krogager (July 2020)
Tinajo townhall has renovated all lights on Avenida Krogager towards La Santa Village.
Sports Booking App
Our Sports Booking App has been updated with new features and a large information section.
Wellness Centre (January 2020)
We are proud to open an upgraded version of the Wellness Centre. We have a new main entrance from the leisure pool, accessible for disabled people. Inside there is a new, large unisex sauna, massage showers, ice fountain and steam bath with illuminated star ceiling. From the inside, you can access our new open air relax area and we have several new and interesting treatments. The interior design has been kept to a more natural colour tone, to give the impression of sustainability and stability. A completely new treatment we now offer is CryoSpace®, a full body ice box to cool you down to -196 degrees for a maximum of 3 minutes. This treatment has many positive effects on the body and mind including accelerating the recovery and regeneration process, increasing physical and mental performance, reducing the risk of injury, improving mood and sleep quality, and boosting energy levels.